• Subscript5676@lemmy.ca
    link
    fedilink
    English
    arrow-up
    1
    ·
    6 hours ago

    Every time I see Hespler Stroad I wince.

    That said though, 4.5B is a really big ask. I think I sorta have an understanding as to why it’s so expensive: Stage 1 was already expensive, so using that as a point of reference and inflation, walla; crossing the Grand River requires infrastructure that’s more complex and involved than almost everything we’ve seen in Stage 1; lots of land acquisition, etc. None of these are easy, but man, 4.5B :(