• AutoTL;DRB
    link
    English
    25 months ago

    This is the best summary I could come up with:


    TEHRAN, Iran (AP) — Iran began construction on four more nuclear power plants in the country’s south, with expected total capacity of 5,000 megawatts, the official IRNA news agency reported Thursday.

    The UN’s nuclear watchdog said last year that Iran has increased the rate at which it is producing near-weapons grade uranium.

    Director General Rafael Mariano Grossi said in the report that Iran “in recent weeks had increased its production of highly enriched uranium, reversing a previous output reduction from mid-2023,” according to an IAEA spokesperson.

    Iran had previously slowed the rate at which it was enriching uranium to 60% purity, which is just a short technical step away from the weapons-grade level of 90%.

    IRNA quoted Mohammad Eslami, the head of Iran’s atomic agency, saying it will take up to nine years to complete the new plants.

    The report said the four new plants are being built in the port town of Sirik on Iran’s east coast, some 1,150 kilometers (715 miles) south of the capital, Tehran.


    The original article contains 269 words, the summary contains 168 words. Saved 38%. I’m a bot and I’m open source!