• AutoTL;DRB
    link
    English
    611 months ago

    This is the best summary I could come up with:


    PURWAKARTA, Indonesia, Nov 9 (Reuters) - Indonesia’s President Joko Widodo on Wednesday inaugurated a 192 megawatt peak (MWp) floating solar power plant on a reservoir in West Java province as part of a drive to increase renewable energy sources and switch away from coal.

    The 1.7 trillion rupiah ($108.70 million) project was developed by PLN Nusantara Power, a unit of Indonesia’s state utility company Perusahaan Listrik Negara (PLN) and United Arab Emirates renewable energy company Masdar, a unit of Mubadala Investment Company.

    “I spoke with Minister Thani from the UAE that this would be expanded to around 500 MWp and we hope more renewable energy could be developed in Indonesia,” the president popularly known as Jokowi told reporters, referring to UAE Minister of Foreign Trade Thani bin Ahmed Al Zeyoudi.

    The solar power infrastructure was built on Cirata reservoir, 108 kilometres (67.11 miles) southeast of Indonesia capital Jakarta.

    Regulations permit up to 20% of the reservoir’s area to be utilised by the solar plant, Darmawan said, adding that discussions were underway with Mubadala for the next phase of the expansion.

    The president instructed us to maintain the momentum so that renewable energy development could be escalated," Darmawan said at the same event.


    The original article contains 320 words, the summary contains 202 words. Saved 37%. I’m a bot and I’m open source!