• @towerful@programming.dev
    link
    fedilink
    English
    491 year ago

    In addition to the expansion loops, the straight sections of pipes are probably not even attached to the supports to allow large sections of the pipes to move, transferring the movement to the expansion loops.

    https://en.m.wikipedia.org/wiki/Trans-Alaska_Pipeline_System

    The trans-alaska pipeline has whole sections built on special skates to reduce the chance of damage from earthquakes (see “Construction” section).
    It also merely rests on its supports to allow for expansion (see “Technical Details” sections).
    In fact, the trans-alaska pipeline changes in length by 5 miles over the course of the year, and was built 11 miles too long to account for this.

    • @IphtashuFitz@lemmy.world
      link
      fedilink
      English
      4
      edit-2
      1 year ago

      Wow, 5 miles is insane…

      If you can find it and you enjoy this sort of thing then try to track down the TV series “Worlds Toughest Fixes” from National Geographic. It ran for about 3 years and followed a professional rigger that helped out with all manner of big/difficult engineering jobs. One of the episodes involved replacing a faulty valve on a section of the Alaska Pipeline.

    • @LukeMedia@lemmy.world
      link
      fedilink
      English
      21 year ago

      Thank you, I love gaining random and interesting knowledge that will likely never be of use to me. It’s really fun!!