• Nougat
    link
    fedilink
    141 year ago

    It’s cheaper to just run cold tapwater in at a fast rate, and dump the hot water into the sewer.

    There should be a cost to corporations using municipal water supplies for purposes unrelated to direct consumption for drinking, cooking, washing, toilets. You shouldn’t be able to use it for cooling only, and you shouldn’t be able to bottle and resell it.

    • MelodiousFunk
      link
      fedilink
      71 year ago

      you shouldn’t be able to bottle and resell it.

      Dasani and Aquafina in shambles

    • grahamsz
      link
      fedilink
      01 year ago

      There’s probably some alternate uses for the heat if these things were well designed. There’s some building in denver that is near a major sewer and in the winter they use a heat exchanger to extract that energy and use it to heat the building.

      • @givesomefucks@lemmy.world
        link
        fedilink
        English
        7
        edit-2
        1 year ago

        Nah, it’s because of the volume.

        You don’t cool down hot water with the same amount of cool water. You use a shit ton of cool water, because the larger the difference in temps the faster the heat exchange.

        So the discharge isn’t water that’s really hot. It’s just warmer than when it went in.

        Maybe 5-10 degrees, which is enough for a negative environmental impact if constantly discharged into a lake/ocean/river, but not hot enough to be good for anything.

        They could do large underground reserve for cold water, cool their servers with it, then dump it into a second tank that eventually cools and is added to the reserve. It’s not complicated, but it is a huge upfront cost.

        Companies aren’t going to do it when they can pay a fraction of the cost even tho it fucks over everyone else. This is capitalism, we need regulations forcing them to do the right thing over the cheap thing.

        • grahamsz
          link
          fedilink
          01 year ago

          I suppose that’s very true. But it could be done - if a data center needs megawatts of cooling and is in an area where buildings need to be heated in the winter, then there should be a legal obligation to not just dump that heat.

            • grahamsz
              link
              fedilink
              01 year ago

              That’s right in the range for subfloor heating, obviously a question of whether or not you can get it somewhere that you need it